With competition ever increasing and legislation ever tightening, UK construction increasingly needs off-site manufacture of prefabricated steel reinforcement. As a leader in off-site modular steel reinforcement, we’re experts in assembling products in a safe, quality-controlled factory environment before adopting a just-in-time supply approach. The benefits are clear, with off-site fabrication leading to faster installation, reduced hook time, less on-site working and fewer safety risks.

ON YOUR SIDE OFF-SITE

Early engagement at the tender stage enables us to optimise the design and construction solution, removing reinforcement from the critical path via smarter off-site fabrication, resulting in an accelerated construction process. It’s our proven track record on projects including Crossrail, HS2 and Heathrow Terminal 5 that has also led to us being the reinforcement partner of choice on many of the UK’s most important nuclear, building and civil infrastructure projects.

ALTOGETHER STRONGER

We believe transparency, clarity and collaboration are the key drivers to successful delivery. It’s the reason why our experts are involved from the initial kick-off meeting right through to the point of final delivery, identifying ways to improve performance, safety and speed of delivery at every stage.